Image

Image
  • April 24th, 2008: Michael Maholick, P.E., Associate & Manager of the Philadelphia Highway Group, will be presenting, Chester Access Improvements - “Commodore Barry Bridge Widening & New Access Ramps” for MASITE at Harrah's Casino in Chester, PA.
  • July 14, 2008: Andrew B. Smith, Vice President, will be presenting his paper on Assessing Indirect Economic Impacts based on Access Improvements, at the 8th National Conference on Access Management in Baltimore, MD.
  • July 16, 2008: Andrew B. Smith,  will also be presenting his paper on Assessing Development Impacts from Infrastructure Alternatives that Vary from Local Land Use Plans, at the 8th National Conference on Access Management in Baltimore, MD.

 

 

 

Warren Street Final Design Project Honored by ACEC/PA

McCormick Taylor is proud to announce the Warren Street Corridor Extension (U.S. 222) Project was recognized with a Diamond Award Certificate from the ACEC/PA. McCormick Taylor was the lead consultant in the final design, environmental permitting and coordination, construction consultation and public outreach to complete the “Southern Section” of the Warren Street Corridor Extension Project. The work, in conjunction with the adjacent relocated section of S.R. 222, was the final link in providing a continuous north-south four-lane highway from the Lancaster-Berks County line into and through the Reading urban area that connects with the existing four-lane Warren Street Bypass (U.S. 422). A total of six bridges, five culverts, two noise walls and various retaining walls were designed in this project.